Issue 20

P. Rezakhani, Frattura ed Integrità Strutturale, 20 (2012) 17-21 ; DOI: 10.3221/IGF-ESIS.20.02 21 [26] D. Huang, T. Chen, M. -J. Wang, Fuzzy Sets and Systems, 118 (2001) 153. [27] J. B. Bowles, C. E. Pelaez, Reliability Engineering and System Safety, 50, (1995) 203. [28] R. K. J. R. Rainer, C. A. Snyder, H. H. Carr, Journal of Management Information Systems, 8 (1) (1991) 129. [29] Sh. Lichtenstein, Information Management and Computer Security, 4 (1996) 20. [30] J. Zeng, M. An, N. J. Smith, International Journal of Project Management, 25, (2007) 589. [31] D. Baloi, A. D. F. Price, International Journal of Project Management, 21, (2003) 261. [32] NCHRP 8-60: Guidebook on Risk Analysis Tools and Management, (2009). [33] L. A. Zadeh, Information Control, 8 (1965) 338. [34] R. Kangari, Civil Engineering System, 5 (1988). [35] R. Kangari, L. S. Riggs, IEEE Transaction on Engineering Management, 36(2) (1989) 126. [36] J. H. Paek, Y. W. Lee, J. H. Ock, Journal of Construction Engineering and Management, 119(4) (1993) 743. [37] V. Carr, J. H. M. Tah, Advances in Engineering Software, 32 (2001), 847–857. [38] H. N. Cho, H. H. Choi, Y. B. Kim, Reliability Engineering and System Safety, 78 (2002) 173. [39] H. Choi, H. Cho, J. W. Seo, Journal of Construction Engineering and Management, 130(2) (2004) 258. [40] T. Lyons, M. Skitmore, International Journal of Project Management, 22 (2004) 51. [41] M. An, C. Baker, J. Zeng, World Journal of Engineering, 2 (2005) 1. [42] I. Dikmen, M. Birgonul, S. Han, International Journal of Project Management, 25 (2007) 494. [43] Y. M. Wang, T.M.-S. Elhag, Computers and Industrial Engineering, 53 (2007) 137. [44] A. Taroun, J. B. Yang, D. Lowe, The Built and Human Environment Review, 4(1) (2011). [45] G. Zhang, P. X. W. Zou, Journal of Construction Engineering and Management, 133 (2007) 771.

RkJQdWJsaXNoZXIy MjM0NDE=